Malaby Biodigester

Malaby Biogas Ltd, Bore Hill Farm Biodigester, Deverill Road, Warminster, Wiltshire, BA12 8FB

  • 11 Sep 2024
  • In person
  • Pre-booking required

Though not technically ‘heritage’, the Biodigester is an important ‘green’ addition to Warminster’s infrastructure that creates electricity out of food waste. Hopefully it will render other forms of electricity generation historic’.

You will be given an explanation of biogas operation and a tour of the plant.
Please dress for the weather and wear sensible shoes. Access to the building is via stairs – we have no lift.

Timings & Tours

Wednesday 11 September:
17:00

Location & directions

Malaby Biogas Ltd, Bore Hill Farm Biodigester, Deverill Road, Warminster, Wiltshire, BA12 8FB

Contact on day:
Thomas Minter

Booking information

Pre-booking requirement:
Pre-booking required
Booking conditions:
To book a place, please email or call Warminster Town Council
Booking contact name:
Warminster Town Council
Booking telephone number:
+441985214847
Booking email:
[email protected]

Accessibility details

Parking is only in designated car park (foot traffic or car sharing preferred). Rough ground unsuitable for wheel chairs – prior arrangement required. Report to reception on arrival and proceed up external stair case to visitors centre (no lift available so all visitors need to be able to negotiate stairs). Alternative arrangements will need to be made for wheelchair access. Site access only when accompanied and supervised by designated site staff. No open toed shoes or high heels

Additional information

Visitors will be given a health and safety induction and loaned a hard hat and hi-vis waistcoat. It is a working industrial facility, so wear sensible footwear: sandals or flip-flops will not be acceptable.

Max no of people per tour:
20

Check out our online channels

Back to results